Tuesday, March 17, 2015

UNDERGROUND REQUIRED amount of energy measurement for water to be drawn pre-installed to measure th


Entrepreneurs Board of Corporate Head of the Delegation of the Supervisory Board Regional Director of Units History Our GÜSAB Logo and figures Services Electricity Gas Treatment Construction Environmental osmoza Reconstruction Consumer & Price Service Special Consumption Statistics Electricity Consumption Natural Gas Consumption drinking Potable osmoza Water Business Directory Full List Textile Food Textile Chemicals Steel Construction Machinery Furniture Auto Parts Industry Activities in the Petroleum Industry Press GÜSAB Unlicensed Salt Production Capacity Monitoring Application Contact
Date 12.16.1960 osmoza and numbered 10688 published in the Official Gazette No. 167 enacted pursuant to the Law on groundwater, determined by the characteristics of the State Hydraulic Works of groundwater osmoza operation areas and are determined. In this context, the Regional Directorate of State Hydraulic Works 1. jurisdiction in areas where water supply drop of water with the aim of drilling exploration wells and use permits are issued by the Regional Directorate of State Hydraulic osmoza Works. osmoza No. 167 Groundwater Law 's 8. Pursuant to Article any pit water supply whatever sections for the purpose of drilling and permission from the State Water Works My Department is the competent authority for the well is mandatory to document. These pursuant to amendments to the Law on 07/06/2011 date and 27 957 in the Official Gazette published enacted DSI Underground Measurement Systems Regulation Article 5 should be well use the wells located in the document, the installation of a measuring system according to the nature is vitally imperative. All powers relating to the application shall be vested in the Regional Directorate of State Hydraulic Works.
3.DS Regional Directorate sent by the "Using the Certificate Request Form" filled pre-installed provided the assembly with the forms, follow-up can be water meter bill DS Using existing wells to be submitted to the Regional Directorate of Permit updated.
MEASUREMENTS TAKEN YERALAT amount of water meters should be pre-installed and can be monitored water meter feature. That can be taken in one year and a maximum amount of water contained in the existing permission to use is specified using the updated document. Is supplied with a pre-paid card to use said card loaded document by DSI. The new installation is done on the front-loading card at the end of each annual period. Fails to use all of the remaining amount of the maximum annual water consumption of a loaded card is not detected and transferred to a subsequent year of the period. The amount of water loaded with pre-paid card is finished ground water is not available.
UNDERGROUND REQUIRED amount of energy measurement for water to be drawn pre-installed to measure the amount of water taken in a year electricity meter is installed in the system. Permission to use the energy required for maximum water can be drawn from groundwater within the scope of the document osmoza is written osmoza in a month is calculated by using the DSI. The amount of new energy is loaded into the card at the end of each annual period. The remaining amount from the date of the determination of the full amount of energy if used within one year will not be transferred to a one-year period. The completion of the year, the amount of energy sufficient to maximum water will be withdrawn in case of using the entire scope of the permission to use, no additional energy in the same period. Protection of 1.Ölç system is the responsibility of the holder is not used and disbursed.
In this regard, TC Forestry and Water Affairs Ministry of State Hydraulic Works 1. Regional Directorate osmoza within the specified time to face any sanctions pursuant to the text which has been sent to your company to ensure the supply by mounting the can be monitored pre-installed water meter and use Document Using wells pursuant to the Request Form Documents capacity should be renewed within 45 days without change.


No comments:

Post a Comment